Bid Package #2 Civil and Structural Ogden Airport Expansion:

Bid Date: December 13, 2022

Bid Time: 2:00 PM

Location: Ogden Airport

Project Description:

Stacey Construction been selected as the CM/GC on the Ogden Airport Expansion and is soliciting pricing on Bid Package #2 – Civil & Structural of the existing Ogden Airport Terminal Building. The Civil & Structural will include site specific civil modification, landscape, structural steel, masonry, wood stud framing, site utilities, etc. Please note, there are several architectural sheets that have been included for reference. Also, there are several references to sheets that are currently under design in preparation for Bid Package #3.

Special Attention should be given to the three (3) deductive alternates

1. Deductive Alternate #1 – Modifications to site entry and exiting

2. Deductive Alternate #2 – Passenger waiting cast in place benches

3. Deductive Alternate #3 – Building expansion to house the airport firetruck (N/E side of existing building)

Please note this project is federally funded and is under the FAA Contract Provisions Guidelines (see pages 54-131). Therefore, prevailing wages (i.e., Davis Bacon) and weekly certified payroll apply. Please refer to the specifications under “Federal Labor Standard” (see pages 48-53 of the PDF specifications). Additionally, this project falls under the Buy American Act (see specification Section 016001, pages 218-221)

Proposals will be evaluated and scored by the OAC committee based on the outlined criteria:

Proposal Cost………………………………..25%
Team and Project Approach……………….25%
Schedule & Material Lead Times………….20%
Past Projects………………………………….15%
References…………………………………….15%

Refer to the Statement of Qualifications packet for further details. Please fill out and provide the Statement of Qualifications with your proposal. The selection committee shall rank submissions based on proposals provided. If necessary, interviews may be conducted to assist in evaluating the proposals. It will be the decision of the selection committee to recommend proceeding with the most favorable service and approach available. Pricing will need to be valid for no less than 30 days.

Portions of the terminal building along with selective airfield utilities will need to remain functional during the complete project.

A pre-bid walk will be held Wednesday, November 30, 2022, at 2:00 pm at 3909 Airport Rd.

Civil & Structural is projected to start early 2023 in conjunction with the construction demolition phase, with all planned construction phases achieving substantial completion by April 2024 or sooner.

Typically, work hours are to be during normal business hours (i.e., 7:00 am -4:00 pm). Hours outside of this time can be coordinated with the CM/GC.

Bid proposals are due Tuesday December 13, 2022, by 2:00 PM

All questions pertaining to the project need to be submitted no later than Friday December 2, 2022, by 5:00 pm in the Excel format provided in the bid documents to Russ Clark at Rclark@staceygc.com. All questions will be shared with all contractors for review.

The scope of work in Bid Package #2 – Civil & Structural includes but is not limited to:
Demolition of the existing structural building elements and finish necessary for the addition and interior buildout
Site utilities
Concrete
Structural Steel
Joist and Decking
New metal stud framing and drywall
Wood Framing
Masonry
Earth work
Landscaping

Project Size:

Estimator Name: Russ Clark

Plans By: Sanders Associates Architects

Plan Availability: See Below

Plans , Specs

If you intend to bid on this project please submit the form below.






    Company Name:*

    Estimators Name:*

    Divisions Bidding:*

    Phone Number:*

    YES we will be bidding this projectNO we will not be bidding this project